This post is also available in:
Français (French)
Herewith an engineering glossary of terms developed during a translation of a technical manual on dams.
EN | FR |
Abutment | Piédroit |
Accessways | Route D’Accès |
Aggregates | Agrégats |
Back-Fill | Remblais |
Baffles | Cuillères |
Bolt | Boulon |
Boring | Forages |
Cast Concrete | Béton Coffré |
Cladding | Coffrages |
Compacted Rolled Concrete (Crc) | Bcr (Béton Compacté Au Rouleau) |
Constraint | Exigurte |
Crush | Concasser |
Declaration | Attestation |
Deep Drain | Évacuateur De Fond |
Description | Désignation |
Downstream Basin | Fosse Aval |
Dredging | Dragage |
Earthquake Resistant Foundations | Appuis Parasismiques |
Excavated Rock Debris | Déblais Rochaux |
Excavation Or Blasting | Déroctage |
False Ceiling Or Floor | Coffrage Perdu |
Finishing | Les Travaux De Second Oeuvre |
Forward Probing | Reconnaissance À L’Avancement |
Framework Reinforcement | Armatures |
Ground Survey | Reconnaissance Des Sols |
High Water | Crues |
Installation | Mise En Œuvre |
Laboratory | Laboratoire |
Leader Wall | Guideau |
Loop Liners | Soutènement |
National Federation Of Public Works (Nfpw) | Fntp |
Pile-Driving | Battage |
Reinforced Concrete | Béton Armé |
Rip Rap | |
Rock-Fill | Enrochement |
Segments Of An Arch | Voussoirs |
Sheet Metal Lining | Tôle De Blindage |
Shotcrete | Béton Projeté |
Sounding | Sondages |
Spillweir | Clapet De Surface |
Stonework | Maçonnerie |
The Project Supervisor | Le Maître D’Œuvre |
Tunnelling Machine (Tbm) | Tunnelier |
Water Sector | La Filière Eau |
Welded Lattices | Treillis Soudé |
Work Of Art | Ouvrages D’Art |